biogas masons

EOL – Construction training Consultancy on the MODIFIED KENBIM BIO-DIGESTER (MKD)

Introduction

As part of ABPP intervention in addressing affordability, the Modified Kenbim Design was born and rolled out in 2016. Since then there has been an increased adoption rate which has buttressed competitiveness of the fixed dome in a rapidly changing bio-digester technology’s landscape. This coupled with the growth in the sector has led to more players demanding for training and capacity building to increase their competitive edge.
To boost market roll-out and product reputation and quality, continuous training and refresher is important. The training will be executed by ToT (Biogas technician) under the supervision of the Quality Manager, KBP.
This Terms of Reference serves to specify the assignment.

Objective of the assignment

The objective of the assignment is to train selected masons and construction companies who will integrate the construction of the new MKD-bio-digesters as a part of their business in the know-how of design, construction and after sales services provision of the MKD bio-digester.

Main Activities

The assignment includes:
a) Compilation of training material, construction manual, technical drawings and bill of quantities for the MKD-biodigester;
b) Brief assessment / scoping of most common construction issues for the MKD-biodigester
c) Preparation and facilitation of the training sessions for the designated mason trainees (both theoretical and practical fieldwork) for the construction of the MKD-biodigester;
d) Formulation of a brief (draft and final) report to the Kenya Biogas Programme;
The KBP and the selected biogas technician (ToT), will support the training sessions with:
 Selection of proper training households (qualifying for biogas, interested to invest in materials, in relative close proximity to each other)
 Preparation of the sites (all materials available on-site, excavation completed, bricks made)
 Logistical support for participants, biogas technician and QM

Time schedule and location (tentative, to be finalized by the expert)

The assignment is scheduled as follows;

Taita Taveta

1) November 4th to 6th , 2019: Assessment, site preparation (setting out, excavation, brick making)
2) November 7th to 15th, 2019: Biogas Construction Training-Taita

Western Region

3) November 16th to 18th , 2019: Assessment, site preparation (setting out, excavation, brick making)
4) November 19th to 26th, 2019: Biogas Construction Training-Western

Financial and Technical bid to the call

Indicate your costs for this assignment which should incorporate:
 All expenses for the ToT; Including remuneration, Expenses for accommodation, transport and food
 All costs will be borne by KBP.
 NB: One entity may bid for both or either one.

Expected output

Output of training in each region:
 Minimum of 20 biogas masons,QSPs & BESPs trained on MKD-biodigester construction (number will depend on turn out)
 Minimum of 2 MKD-biodigesters will be constructed at selected household sites in the vicinity of the chosen training localities in the areas.
 All trainees shall be provided with a MKD construction manual, MKD design drawings and MKD BoQ forms.
 Plants built for training purposes will be built at selected household sites in the vicinity of the chosen training localities in the areas.
 Draft and final report on the training

NB: All responses should be sent to info@kbp.co.ke and copied to mwasonga@kbp.co.ke before 1st November.

EOL – MKD training Kenya

Download File – 109 KB